Atlantis Sweater |
|||||||||||||
![]() |
![]() |
||||||||||||
Jumper with domino squares, garter stitch, stripes and raglan, knitted top down. Size: S - XXXL Piece is knitted in DROPS Fabel.
DROPS 188-15 |
|||||||||||||
INFORMATION FOR PATTERN: GARTER STITCH (back and forth - applies to domino squares): 1 ridge = knit 2 rows. GARTER STITCH (worked in the round): 1 ridge = 2 rounds. Knit 1 round and purl 1 round. RAGLAN (applies to yoke): SIZE S-M-L-XL: ROUND 1: Purl all stitches. ROUND 2: Make 1 yarn over after 1st-3rd-4th-6th marker and 1 yarn over before 2nd-3rd-5th-6th marker (= 2 stitches increased on each sleeve, 2 stitches increased on front and back piece = 8 stitches increased in total on round). ROUND 3 (and all rounds purled): Purl all stitches, do not work yarn overs twisted; they should make holes. ROUND 4: Increase 4 stitches on front and back piece as follows: Make 2 yarn overs after 3rd and 6th marker as follows: Work to and with stitch with marker, 1 yarn over, knit 1, 1 yarn over. Make 2 yarn overs before 3rd and 6th marker as follows: Work until 1 stitch remains before stitch with marker, 1 yarn over, knit 1, 1 yarn over (= 4 stitches increased on front and back piece = 8 stitches increased in total on round). ROUND 6: Work as 2nd round (= 2 stitches increased on each sleeve, 2 stitches increased on front and back piece = 8 stitches increased in total on round). ROUND 8: Make 1 yarn over after 3rd and 6th marker and 1 yarn over before 3rd and 6th marker (= 2 stitches increased on front and back piece = 4 stitches increased in total on round). ROUND 10: Work as 2nd round (= 2 stitches increased on each sleeve, 2 stitches increased on front and back piece = 8 stitches increased in total on round). SIZE XXL-XXXL: ROUND 1: Purl all stitches. ROUND 2: Make 1 yarn over after 1st-3rd-4th-6th marker and 1 yarn over before 2nd-3rd-5th-6th marker (= 2 stitches increased on each sleeve, 2 stitches increased on front and back piece = 8 stitches increased on round). ROUND 3 (and all rounds purled): Purl all stitches, do not work yarn overs twisted; they should make holes. ROUND 4: Increase 4 stitches on front and back piece as follows: Make 2 yarn overs after 3rd and 6th marker as follows: Work to and with stitch with marker, 1 yarn over, knit 1, 1 yarn over. Make 2 yarn overs before 3rd and 6th marker as follows: Work until 1 stitch remains before stitch with marker, 1 yarn over, knit 1, 1 yarn over (= 4 stitches increased on front and back piece = 8 stitches increased in total on round). ROUND 6: Work as 2nd round (= 2 stitches increased on each sleeve, 2 stitches increased on front and back piece = 8 stitches increased on round). ROUND 8: Work as 4th round (= 4 stitches increased on front and back piece = 8 stitches increased in total on round). ROUND 10: Work as 2nd round (= 2 stitches increased on each sleeve, 2 stitches increased on front and back piece = 8 stitches increased on round). ROUND 12: Work as 2nd round (= 2 stitches increased on each sleeve, 2 stitches increased on front and back piece = 8 stitches increased on round). INCREASE TIP-1: Work 2 stitches in 1 stitch. INCREASE TIP-2: Increase with 1 yarn over between 2 stitches. Knit yarn over twisted on next round to avoid hole. DECREASE TIP (applies to mid under sleeve): All decreases are made on a round with knit. Decrease on each side of marker as follows: Begin 4 stitches before marker, knit 2 together, knit 4 (marker is in the middle of these stitches), slip 1 stitch knitwise, knit 1, pass slipped stitch over stitch worked (= 2 stitches decreased). KNITTING TIP (applies to domino squares): Always pick up stitches from right side. STRIPES: Work first row in every stripe from right side (applies to domino squares). Knit first round in every stripe (applies to sleeves). Work 1 ridge with light pearl grey. Work 1 ridge with blue lagoon. WHOLE DOMINO SQUARE: Insert 1 marker thread in the middle stitch. ROW 1 (= wrong side): Knit all stitches. ROW 2 (= right side): Knit until 1 stitch remains before marker thread, slip 1 stitch knitwise, knit 2 together, pass the slipped stitch over stitches worked, knit the rest of row. Repeat 1st and 2nd row, i.e. decrease 2 stitches in the middle of the square on every other row until 1 stitch remains, cut the yarn and pull it through stitch. HALF DOMINO SQUARE (horizontal): Work as whole domino square but in addition to decreasing in the middle of square, slip last stitch at the end of every row on 1 stitch holder. Continue until 7-5-7-7-7-7 stitches remain on needle (= 9-10-10-11-12-13 stitches on stitch holder in each side). Knit 1 row from wrong side and slip last stitch at the end of row on stitch holder = 6-4-6-6-6-6 stitches on needle. Work next row (= from right side) as follows: Knit 1-0-1-1-1-1, slip 1 stitch knitwise, knit 2 together, pass slipped stitch over the 2 stitches worked together (= 2 stitches decreased), knit 1-0-1-1-1-1, slip last stitch at the end of row on stitch holder = 3-1-3-3-3-3 stitches. Slip these stitches on stitch holder as well. Cut and fasten the yarn. There are now 23-23-25-27-29-31 stitches in total on stitch holder. ---------------------------------------------------------- JUMPER: Work yoke in the round, top down. Increase out for raglan on each side of each sleeve and mid front and mid back. When yoke is done, work 1 and 1 domino square back and forth. Work sleeves in garter stitch in the round at the end. YOKE: Cast on 106-122-122-134-134-142 stitches on circular needle size 2.5 mm with blue lagoon. Work 2 ridges in GARTER STITCH - see explanation above. Switch to circular needle size 3.5 mm. Work next round as follows: Right sleeve: Work 1 stitch in garter stitch and insert 1st marker in this stitch, 1 yarn over, work 22 stitches in garter stitch and increase 0-0-2-2-0-0 stitches evenly, 1 yarn over, work 1 stitch in garter stitch and insert 2nd marker in this stitch (= 26-26-28-28-26-26 stitches). Front piece: Work 14-18-18-21-21-23 stitches in garter stitch and increase 0-0-4-0-2-7 stitches evenly, 1 yarn over, work 1 stitch in garter stitch and insert 3rd marker in this stitch (= mid front), 1 yarn over, work 14-18-18-21-21-23 stitches in garter stitch and increase 0-0-4-0-2-7 stitches evenly (= 31-39-47-45-49-63 stitches). Left sleeve: Work 1 stitch in garter stitch and insert 4th marker in this stitch, 1 yarn over, work 22 stitches in garter stitch and increase 0-0-2-2-0-0 stitches evenly, 1 yarn over, work 1 stitch in garter stitch and insert 5th marker in this stitch (= 26-26-28-28-26-26 stitches). Back piece: Work 14-18-18-21-21-23 stitches in garter stitch and increase 0-0-4-0-2-7 stitches evenly, 1 yarn over, work 1 stitch in garter stitch and insert 6th marker in this stitch (= mid back), 1 yarn over, work 14-18-18-21-21-23 stitches in garter stitch and increase 0-0-4-0-2-7 stitches evenly (= 31-39-47-45-49-63 stitches) = 114-130-150-146-150-178 stitches in total. Work and increase for RAGLAN - see explanation above, begin on 3rd round. REMEMBER THE KNITTING TENSION! Work 3rd to 10th-10th-10th-10th-12th-12th round 1 time = 142-158-178-174-190-218 stitches (= 30-30-32-32-32-32 stitches on each sleeve and 41-49-57-55-63-77 stitches on front and back piece). Repeat 1st to 10th-10th-10th-10th-12th-12th round 7-7-8-8-7-7 times = 394-410-466-462-526-554 stitches (= 72-72-80-80-88-88 stitches on each sleeve and 125-133-153-151-175-189 stitches on front and back piece). Then work the first 0-6-0-4-4-8 round 1 more time = 394-434-466-478-542-586 stitches (= 72-76-80-82-90-92 stitches on each sleeve and 125-141-153-157-181-201 stitches on front and back piece). Piece now measures approx. 18-20-21-22-23-24 cm measured along the shoulder. Purl 1 round. Now divide the piece on next round (knitted): Right sleeve: Slip the first 72-76-80-82-90-92 stitches (including stitches with 1st and 2nd marker) on a stitch holder for sleeve, cast on 8-8-8-12-12-12 stitches under sleeve (insert 1 marker thread in the middle of these new stitches). Front piece: Knit 2 together (= 1 stitch decreased), knit until 3rd marker (= 60-68-74-76-88-98 stitches), 1 yarn over (= 1 stitch increased), knit 1 (= stitch with 3rd marker), 1 yarn over (= 1 stitch increased), knit until 2 stitches remain before 4th marker (= 60-68-74-76-88-98 stitches), knit 2 together (= 1 stitch decreased = 125-141-153-157-181-201 stitches). Left sleeve: Slip the next 72-76-80-82-90-92 stitches (including stitches with 4th and 5th marker) on a stitch holder for sleeve, cast on 8-8-8-12-12-12 stitches under sleeve (insert 1 marker thread in the middle of these new stitches). Back piece: Knit 2 together (= 1 stitch decreased), knit until 6th marker (= 60-68-74-76-88-98 stitches), 1 yarn over (= 1 stitch increased), knit 1 (= stitch with 6th marker), 1 yarn over (= 1 stitch increased), knit until 2 stitches remain on needle (= 60-68-74-76-88-98 stitches), knit 2 together (= 1 stitch decreased = 125-141-153-157-181-201 stitches) = 266-298-322-338-386-426 stitches in total (= 133-149-161-169-193-213 stitches on front and back piece). Cut the yarn. Displace the round so that it begins mid under right sleeve (i.e. round is displaced to marker thread). Purl 1 round, do not work yarn overs twisted; they should make holes AT THE SAME TIME increase 5-0-0-0-0-0 stitches evenly before tip mid front – read INCREASE TIP-1, 5-0-0-0-0-0 stitches evenly before marker in the side under left sleeve, 5-0-0-0-0-0 stitches evenly before tip mid back and 5-0-0-0-0-0 stitches evenly before marker under right sleeve = 20-0-0-0-0-0 stitches increased in total = 286-298-322-338-386-426 stitches. Now slip stitches on 2 stitch holders while at the same time working them as follows: Work 2 stitches in next stitch (= 1 stitch increased), knit the next 19-19-22-20-23-27 stitches (leave stitch on needle, first domino square is worked over these stitches later), knit until 20-20-23-21-24-28 stitches remain before marker thread under left sleeve, then slip them on stitch holder number 1 (= 103-109-115-127-145-157 stitches on 1st stitch holder), knit 19-19-22-20-23-27, work 2 stitches in next stitch (= 1 stitch increased), knit 20-20-23-21-24-28 stitches, leave stitches on needle (work first domino square under left sleeve over these 41-41-47-43-49-57 stitches), knit until 20-20-23-21-24-28 stitches remain before marker thread under right sleeve, then slip them on stitch holder number 2 (= 103-109-115-127-145-157 stitches on 2nd stitch holder ), knit 20-20-23-21-24-28 and leave them on needle (= 41-41-47-43-49-57 stitches on needle under each sleeve). Cut and fasten the thread. DOMINO SQUARES: See chart below, numbers on chart describe which domino square you are working. First work 1 domino square mid under right sleeve (= 1.1). Then work 1 and 1 domino square. Work domino squares with 2 double pointed needles size 3.5 mm. Pick up stitch with blue lagoon. Work all domino squares in STRIPES and GARTER STITCH – see explanation above, (i.e. work first row in lagoon from wrong side, change colour to light pearl grey and then work stripes). RIGHT FRONT/BACK PIECE: 1ST ROW WITH DOMINO: DOMINO 1.1: Now work WHOLE DOMINO SQUARE – see explanation above, over the 41-41-47-43-49-57 stitches under right sleeve. 2ND ROW WITH DOMINO: DOMINO 2.1: Slip the last 15-16-17-19-24-26 stitches from stitch holder towards mid front/mid back back on double pointed needles 3.5 mm and pick up 16-17-18-20-25-27 stitches – read KNITTING TIP, on half right side of 1st domino square (pick up more stitches in right side of 1st domino square on 3rd row with domino square later) = 31-33-35-39-49-53 stitches. Work the whole domino square. DOMINO 2.2: Pick up 16-17-18-20-25-27 stitches from middle of left side (= half side) of 1st domino square (= towards mid front/mid back), and slip the first 15-16-17-19-24-26 stitches from stitch holder towards mid front/mid back back on double pointed needles size 3.5 mm = 31-33-35-39-49-53 stitches. Work the whole domino square. Now there is 2 whole domino squares on 2nd row with domino, i.e. 1 domino on each side of the 1st domino square has been worked. 3RD ROW WITH DOMINO: DOMINO 3.1: Slip the next 17-18-19-21-24-26 stitches from stitch holder towards mid back/mid front back on double pointed needles 3.5 mm and pick up 18-19-20-22-25-27 stitches in right side of domino square 2.1 = 35-37-39-43-49-53 stitches. Work whole domino square. DOMINO 3.2: Pick up 18-19-20-22-25-27 stitches in left side of domino square 2.1 and pick up 17-18-19-21-24-26 stitches on last half in right side of 1st domino square = 35-37-39-43-49-53 stitches. Work whole domino square. DOMINO 3.3: Pick up 17-18-19-21-24-26 stitches in last half on left side of 1st domino square and pick up 18-19-20-22-25-27 stitches in right side of domino square 2.2 = 35-37-39-43-49-53 stitches. Work whole domino square. DOMINO 3.4: Pick up 18-19-20-22-25-27 stitches in left side of domino square 2.2 and slip the next 17-18-19-21-24-26 stitches from stitch holder towards mid front/mid back back on double pointed needles size 3.5 mm = 35-37-39-43-49-53 stitches. Work whole domino square. 4 domino squares have been worked on 3rd row with domino. LEFT FRONT/BACK PIECE: Work 1st to 3rd row with dominos as on right front/back piece. Now work dominos over both left front/back piece and right front/back piece as explained below and as numbers on chart show. 4TH ROW WITH DOMINO: DOMINO 4.1: Slip the next 20-21-22-24-25-27 stitches from stitch holder towards mid front back on double pointed needles 3.5 mm and pick up 19-20-21-23-24-26 stitches in right side of domino square 3.1 = 39-41-43-47-49-53 stitches. Work whole domino square. DOMINO 4.2 TO 4.4: Pick up 19-20-21-23-24-26 stitches in one side of domino square from 3rd row and pick up 20-21-22-24-25-27 stitches in one side of next domino square from 3rd row = 39-41-43-47-49-53 stitches. Work whole domino square. DOMINO 4.5: Pick up 19-20-21-23-24-26 stitches in left side of domino square 3.4 and slip the next 20-21-22-24-25-27 stitches from stitch holder towards mid back back on double pointed needles size 3.5 mm = 39-41-43-47-49-53 stitches. Work whole domino square. DOMINO 4.6: Slip the last 19-20-21-23-24-26 stitches from stitch holder mid back back on double pointed needles 3.5 mm and pick up 20-21-22-24-25-27 stitches in right side of domino square 3.1 = 39-41-43-47-49-53 stitches. Work whole domino square. DOMINO 4.7 TO 4.9: Pick up 19-20-21-23-24-26 stitches in one side of domino square from 3rd row and pick up 20-21-22-24-25-27 stitches in one side of next domino square from 3rd row = 39-41-43-47-49-53 stitches. Work whole domino square. DOMINO 4.10: Pick up 20-21-22-24-25-27 stitches in left side of domino square 3.4 and slip the last 19-20-21-23-24-26 stitches from stitch mid front back on double pointed needles size 3.5 mm = 39-41-43-47-49-53 stitches. Work whole domino square. 10 domino squares have been worked on 4th row with domino. 5TH ROW WITH DOMINO: DOMINO 5.1 TO 5.10: Pick up 21-22-23-25-27-29 stitches in one side of domino square from 4th row and pick up 22-23-24-26-28-30 stitches in one side of next domino square from 4th row = 43-45-47-51-55-59 stitches. Work whole domino square. 10 domino squares have been worked on 5th row with domino. 6TH ROW WITH DOMINO: DOMINO 6.1 TO 6.10: Pick up 21-22-23-25-27-29 stitches in one side of domino square from 5th row and pick up 22-23-24-26-28-30 stitches in one side of next domino square from 5th row = 43-45-47-51-55-59 stitches. Work whole domino square. 10 domino squares have been worked on 6th row with domino. 7TH ROW WITH DOMINO: DOMINO 7.1 TO 7.10: Pick up 21-22-23-25-27-29 stitches in one side of domino square from 6th row and pick up 22-23-24-26-28-30 stitches in one side of next domino square from 6th row = 43-45-47-51-55-59 stitches. Work HALF DOMINO SQUARE (horizontal) - see explanation above. 10 half domino squares have been worked (horizontally) on 7th row with domino. On each domino 23-23-25-27-29-31 stitches have been slipped on a stitch holder (work an edge over these stitches). Fasten all yarns. EDGE: Work edge in the round in blue lagoon. Each domino has 23-23-25-27-29-31 stitches slipped on stitch holder = 230-230-250-270-290-310 stitches on stitch holders. Slip stitches back on circular needle size 3.5 mm. Work 2 ridges AT THE SAME TIME on first round increase 4-6-6-7-6-7 stitches evenly over every half domino square (= 27-29-31-34-35-38 stitches on every domino = 40-60-60-70-60-70 stitches increased in total) – read INCREASE TIP-2 = 270-290-310-340-350-380 stitches in total. NOTE! If the edge is tight, increase more stitches in every domino. Loosely cast off. SLEEVE: Work sleeves in blue lagoon. Slip the 72-76-80-82-90-92 stitches from stitch holder back on double pointed needles size 3.5 mm and pick up 1 stitch in each of the 8-8-8-12-12-12 stitches cast on under sleeve = 80-84-88-94-102-104 stitches. Insert 1 marker in the middle of the new stitches under the sleeve. Work sleeves in garter stitch in the round. When piece measures 2 cm, decrease 1 stitch on each side of marker (= 2 stitches decreased) - read DECREASE TIP. Decrease like this every 9th-8th-8th-7th-6th-5th round 16-17-17-19-22-22 times in total = 48-50-54-56-58-60 stitches. When piece measures 35-33-33-32-31-30 cm, adjust so that last round is purled. Work 4 ridges in stripes, work first stripes in light pearl grey. Cast off, make sure to avoid a tight cast-off edge, cast off with 1 larger needle size if needed. Sleeve measures approx. 37-35-35-34-33-32 cm from where sleeve was divided from body. Work the other sleeve the same way. |
|||||||||||||
Diagram explanations |
|||||||||||||
|
|||||||||||||
![]() |
|||||||||||||
![]() |
|||||||||||||
Have you made this or any other of our designs? Tag your pictures in social media with #dropsdesign so we can see them! Do you need help with this pattern?You'll find tutorial videos, a Comments/Questions area and more by visiting the pattern on garnstudio.com. © 1982-2024 DROPS Design A/S. We reserve all rights. This document, including all its sub-sections, has copyrights. Read more about what you can do with our patterns at the bottom of each pattern on our site. |
Comments / Questions (55)
Jeg i gang med denne fine sweater og er nået til domino ruderne. Jeg har strikket 1.1 og kan ikke forstå når jeg strikker 2.1 og 3.2 at jeg skal presse disse to ruder i på siden af 1.1 når alle ruder har samme antal masker Og altså samme størrelse
29.10.2020 - 13:58Co to znaczy ? dalej przerabiać 7-7-8-8-7-7 razy okrążenia 1-10-10-10--10-12-12
20.06.2020 - 21:21DROPS Design answered:
Witaj Beato! Dalej przerabiać 7-7-8-8-7-7 razy okrążenia od 1 do 10 lub od 1-12 (w zależności od rozmiaru, który wykonujesz). Patrz REGLAN (karczek) powyżej. Pozdrawiamy!
23.06.2020 - 09:07Klopt het dat in d beschrijving van de raglan Naald 5 niet staat aangegeven maar staat vij naald 4?
24.04.2020 - 15:48DROPS Design answered:
Dag Anneke,
De 5e naald is een averechte naald en deze brei je als naald 3. Dit geldt ook voor naald 7, 9, enzovoort.
25.04.2020 - 20:14Jag fastnade direkt. Det står inte var jag skall sätta markörerna.
10.04.2020 - 17:09DROPS Design answered:
Hej Under "OK" står det var du ska sätta markörerna. Lycka till!
14.04.2020 - 11:09This pattern works if 1:1 dominoes decreases are every 4th row instead of every 2nd row for the smaller dominoes. Great pattern though.
11.01.2020 - 18:19Hallo, ich verstehe die Reihe 2 nicht... für die Reihe 2 soll nach und vor dem Markierer bei Größe M je eine Masche zugenommen werden - und das macht dann 8?? Stehe gerade auf dem Schlauch.... Danke schon mal für die Antwort!
20.12.2019 - 15:49DROPS Design answered:
Liebe Silke, bei der 2. Runde Größe M, stricken Sie: 1 Umschlag nach dem 1.-3.-4.-6. Markierer (= Total 4 Umschläge) und 1 Umschlag vor dem 2.-3.-5.-6. Markierer (= Total 4 Umschläge), Sie haben jetzt 8 Umschläge, davon sind 2 Umschläge/Maschen an jedem Ärmel zugenommen, und 2 Umschläge/Maschen am je Vorderteil und am Rückenteil zugenommen = insgesamt 8 Maschen zugenommen in der Runde). Viel Spaß beim stricken!
20.12.2019 - 16:31I refer to Mrs Aubrey problem as I don't understand. The chart indicates 1.1 is larger than the other dominoes. If I pick up 57 stitches for 1.1 i get a dominoes the same size. I must be reading it incorrectly but can't see another way. Please clarify.
18.11.2019 - 11:34DROPS Design answered:
Dear Mrs Hutton, you will knit 2 dominos 1.1: one on the right front piece/back piece + one on the left front piece/back piece (first one under right sleeve, second one under the left sleeve). Then you work the 2nd row of dominos with only 26 sts (larger size) - see domino 2.1. Happy knitting!
18.11.2019 - 12:15Vorrei sapere, per favore, perché i quadrati, dopo il primo, sono di misura più piccola e diventano poi più grandi verso l'orlo .Forse la maglia è più stretta in vita? Dal grafico non si direbbe.Potrei avere una risposta veloce? È un bellissimo modello,originalissimo, ma complicato,e lo devo realizzare al più presto per il compleanno di una mia amica. Grazie.
19.09.2019 - 17:56DROPS Design answered:
Buongiorno Anna. I quadrati diventano più grandi verso la parte inferiore della maglia per ottenere una forma finale leggermente ad A, quindi più larga nella parte in basso. Segua con attenzione le indicazioni del testo per ottenere un buon risultato finale. Buon lavoro!
19.09.2019 - 19:15Vilken otroligt och onödigt krånglig instruktion! Orkar tyvärr inte sticka detta läckra plagg. Varför inte skriva all raglan-specifik information direkt i instruktionen till oket? Och ingenstans hittar jag placeringen av markörarna. MYCKET förvirrande! Era instruktioner brukar faktiskt vara rätt oöversiktliga och knepigt att följa, och kräver en del tålamod och tankearbete (egentligen är ju en instruktion till för att SLIPPA tänka?!) men denna är tyvärr helt omöjlig.
26.05.2019 - 09:15Hello! Could you please give a yarn quantity for doing the sweater in a single colour? Thank you!
01.05.2019 - 13:07DROPS Design answered:
Dear Lynne, for single coloured sweater you need 450-500-550-600-650-750 g DROPS Fabel. Happy knitting!
01.05.2019 - 20:00