Corrections for DROPS No. 117 All our patterns are carefully reviewed and proof read. We take pride in providing knitting and crochet patterns that are correct and easy to understand, but we cannot be held responsible for possible mistakes. The patterns on our website are always updated immediately if we discover a mistake.
Pattern 1
11.08.2009
New chart M.7 is published
Pattern 1 17.08.2009
Correct buttons should be #522
Pattern 3 17.08.2009
ROUND 6 : ...
Along the shorter side there are now 23 tr and along the 2 other sides there are 25 tr (dtr in corners not included). Pattern 9 07.09.2009
New chart published
Pattern 16 18.08.2009
Crochet 37 ch with crochet hook size 7 mm and beige mix. Continue in STRIPES..
Pattern 17 22.10.2009 Pattern 17 22.10.2009
Cast off the next 14-16-18-18-20-22 sts and work remaining 10-12-12-13-13-13 sts. Turn piece.
New text: Size S +M +L: work 10-12-12. Turn piece, cast off 5-6-6 sts and work the remaining 5-6-6 sts on row. Turn piece, work 5-6-6 sts. Turn piece, cast off 5-6-6 sts. Size XL + XXL + XXXL: work 13-13-13 sts. Turn piece, cast off 3 sts and work the remaining 10 sts. Turn piece, work 10 sts. Turn piece, cast off 2 sts and work the remaining 8 sts. Turn piece, work 8 sts. Turn piece, cast off 2 sts and work the remaining 6 sts, continue casting off the first 2 sts at side until all sts are cast off. Pattern 22 16.09.2009
Start working pattern on row from WS:
BACK PIECE: ..........When piece measures 46-49-52-48-51-53 cm work PATTERN on next row from WS as follows..... LEFT FRONT PIECE: ............When piece measures 46-49-52-48-51-53 cm work pattern on next row from WS as follows...... Pattern 41 19.10.2009
Chart M.1: The arrow is moved two rows down, new chart with this correction has been published.
Pattern 44 19.08.2009
When piece measures 46 cm work 6 rows garter st and bind off.
Pattern 50 08.09.2009
DROPS burned wooden button no 511: 6 pcs.
|