Corrections for DROPS No. 109 All our patterns are carefully reviewed and proof read. We take pride in providing knitting and crochet patterns that are correct and easy to understand, but we cannot be held responsible for possible mistakes. The patterns on our website are always updated immediately if we discover a mistake.
Pattern 1
02.07.2008
Amount of yarn needed:
800-850-950-1000-1100-1200 gr = 16-17-19-20-22-24 balls Pattern 3 30.06.2008
New chart M.1 row no 11
Pattern 27 30.06.2008
Bag: ..When piece measures 8 cm inc 1 st each side and repeat the inc on every 11 cm a total of 5 times = 45 sts. Insert a Marking Thread (MT) when piece measures 61 cm (bottom of bag). When piece measures 9 cm from MT dec 1 st each side and repeat the dec on every 11 cm a total of 5 times = 35 sts.
At the same time when piece measures 10 cm continue as follows: stocking st on the first 9 sts, M.1 – see above – on the next 25 sts, stocking st on the remaining 9 sts. Continue in pattern like this + the dec. Cast off when piece measures 61 cm from MT. Pattern 28 30.07.2008
Right front piece:
...on every 3.5-3.5-3-2.5-2.5-2 cm a total of 7-8-9-9-10-10 times. (one number too many) Pattern 28 30.10.2008
and use: DROPS Kid-Silk from Garnstudio
color no 10, grey 150-150-175-200-200-225 g Pattern 36 18.08.2008
Length: ca 160 cm. Scarf: ... When piece measures approx 159 cm P 1 row from WS.
Pattern 47 30.07.2008
Right front piece: Cast on like left front piece. Knit 1 row. Then work like left front piece (first row = WS). Additionally make 2 buttonholes,
Pattern 52 30.07.2008
DROPS double pointed needles and circular needle (80 cm) size 2.5 mm – for rib and garter st.
Jacket: ...on circular needle size 2.5 mm with Alpaca (many sts so the rib won’t be tight-fitting). P 1 row from WS... |