Corrections for DROPS No. 107 All our patterns are carefully reviewed and proof read. We take pride in providing knitting and crochet patterns that are correct and easy to understand, but we cannot be held responsible for possible mistakes. The patterns on our website are always updated immediately if we discover a mistake.
Pattern 2
28.04.2008
Back piece: ... Work next row as follows from RS: 1 edge st, *6 garter sts ..
Front piece: ... Work next row as follows from RS: 1 edge st, *3 stocking sts... Pattern 6 23.04.2008
Back piece:
Change to needle size 5.5 mm. Work 12 rows garter st, at the same time inc 12-10-14-16-17-19 sts evenly on first row = 66-72-80-90-99-109 sts. Left front piece:..... At the same time when piece measures 56-59-62-64-67-70 cm work 2 rows garter st on the 8 front band sts only. Pattern 8 11.04.2008
The right order for diagram text is:
blank square = K cross in square = P triangle in bottom right corner = K2 tog triangle in bottom left corner = slip 1 st as if to K, K1, psso upwards triangle in center of square = slip 1 st as if to K, K2 tog, psso circle in square = 1 YO diagonal line in square = P2 tog downwards triangle in center of square = P3 tog Pattern 11 04.06.2008
There is a new chart for M1 published.
Pattern 17 09.06.2008
Back piece: .... Work 4 rows garter st and then K 1 row from RS, at the same time dec 4-4-2-4-2-2 sts evenly = 70-78-86-94-106-114 sts.
Pattern 18 18.02.2008
New measurement chart
Pattern 28 20.06.2008
diagram symbols
empty box = K from RS, K from WS Pattern 37 26.03.2008
Button cover: Crochet 1 cover with crochet hook size 3.5 mm and pink Muskat as follows: 2 ch, then 16 tr in the first ch...
|